17TGG服務商

标题: doudoune parajumpers for example [打印本页]

作者: vzcr6814vki    时间: 2014-12-20 14:51
标题: doudoune parajumpers for example
had never set foot in the field of environmental protection Shougang decided to take this opportunity to develop new industries, and then set up the team began the preliminary investigation, they use less than a year to complete the siting, design and a series of process equipment the work. Taking into account the people can not accept the construction of the incineration plant in the city where incineration plant located in Mentougou address strobe tanzhesi town,doudoune parajumpers, 40 km from the city center of Shougang limestone mine.July 21,tn pas chere, 2010, after a special meeting to discuss the government, with a total investment of 2.16 billion yuan Lu Jiashan project officially started. Lu Jiashan waste incineration power plant by the Beijing Municipal Government and the Shougang Group to build a 50-50, concession period of 30 years.Shougang limestone mining because of the surrounding residents rarely been less resistance from the public,air max femme, the project through the "green channel" to speed up the approval process, with only three months to Banqi all the formalities required for construction. This was caused by doubts.
the approval rate is so fast people are opposed to the government in order to avoid emergency and launched the project. The Government explained that the garbage of the storm is imminent.Into the plant, closed shop and no trace of odor outside. Garbage truck garbage transfer stations have been shipped from the early sorting and pre-treated waste, discharge into the hall through the garbage dedicated channel, into the garbage tank. After 5-7 days of fermentation tanks, garbage leachate possible prolapse. Prolapse of the leachate will enter a dedicated processing system, and after fermentation were put into the garbage incinerator.According to the Minister of Technology Zhao Shuming introduced, the entire project is fully incorporated world-class equipment,nike tn pas cher magasin, incineration process using German Martin incineration technology and Mitsubishi's grate.
according to the requirements of the central area of Beijing by the end of 2010 steel all discontinued, facing the industrial transformation of Shougang sights on city services, and waste is placed just in front of the government is a major problem.At the time,boutique louboutin, the "Eleventh Five-Year Plan" of four waste incineration projects Gaoantun only after the completion of the twists and turns, Six Mile Village,hollister homme, Palace and Asuwei incinerators have blocked at the garbage situation will have nowhere to go, government had to look for opportunities to build a replacement project.Learned of the situation.
actually tried quite upset after many ways: "Some of the world we have tried, and not the world we have tried, and are ended in failure. "An official working in the field of waste disposal also expressed a similar view: "Not to say no to work,tn requin, but there is no real proof to achieve this effect,air max pas cher femme, plasma gasification, refining, fuel ... do all over the country have tried, the results. will not work, and finally only be incinerated. can only say that this is the choice of history, at this stage, this process is not necessarily the best,tom ford, but the most appropriate. "But for such an explanation,boutique louboutin paris, Zhao Zhang Yuan not agree. He believes that although the private sector resources and technology are still not mature enough, but it is an inevitable process of development of things. "If our government supports a number, select some relatively good technical support to overcome some of the difficulties they do not like it?"Zhao Zhang Yuan has always believed that "utilization" is the best way to waste disposal. In recent years, he has been in the country related visits, and in 2011 with a number of domestic waste disposal companies set up a "Chinese junk Recycling Industry Association," together, in order to promote the development and application of technology resources.However, in addition to technical problems yet to be overcome, placed in the garbage resource road barriers as well as costs."Waste is more economic problems, not a technical issue." Chief Engineer of China Academy of Urban Construction, has been involved in Asuwei Waste Treatment Plant pre-project assessment Xu Haiyun told the "China News Weekly."He said kitchen waste, for example,tn pas chere, have been proposed after the kitchen waste collection, made of fertilizer to the fields. Such technology is not complicated,boutique louboutin paris, but for millions of people in big cities such Beijing, the surrounding farmland and not enough to accept, if you want to deal with these fertilizers,Giuseppe Zanotti Paris, you need to transport by rail to other areas of farmland.
and thus energy consumption, increased emissions resulting costs "theoretically can dock,barbour femme, but the reality is not docked.""The garbage into resources is no problem, no problem hundred percent into resources, then regardless of the cost, but the reality is impossible." Xu Haiyun that the choice of the technical route and waste disposal must be adapted to the economic level of the community, in our current Under the situation,louboutin soldes, if only emphasizes the "garbage is a misplaced resource areas" instead of cost accounting is entirely feasible.On the "burning" technology with suspicionLin Shi Road, west along the way, through the tunnel tanzhesi lump Lu Road, less than five kilometers will be able to see Jiashan Lu hillside waste incineration plant. It is also a youth environmental education base.
the project early in the design chosen in white and green color, into the plant cartoon style elements.As the largest of the three existing waste incineration power generation projects, one of Lu Jiashan waste incineration power plant began trial run from the end of last year, is still in the commissioning phase,felpe hollister, completion of ongoing environmental acceptance. According to the plan, the project after the formal operation can handle 3000 tons garbage every day, the annual generating capacity of up to 360 million degrees,site hollister, Internet 280 million degrees,tn, but also for the region tanzhesi area of 10 million square meters of heating.However, this huge project is in fact the product of unplanned.The second half of 2009.
相关的主题文章:

  
   http://bbs.ccpjl.com/home.php?mod=space&uid=37996
  
   http://www.8liuxing.com/home.php?mod=spacecp&ac=blog&blogid=
  
   http://ec2-54-86-57-40.compute-1.amazonaws.com:8080/question/15612/hollister-italia-as-the-executive/
  
   http://bbs.52jv.com/home.php?mod=space&uid=461359
  
   http://www.tskjzj.com/home.php?mod=space&uid=6756
  
   http://www.8liuxing.com/home.php?mod=spacecp&ac=blog&blogid=
  
   [url=http://www.axiabridge.com/sunbbs/sunbbs.cgi?mode=form&no=11&page=Lastseasonwhowas[/urloi]http://www.axiabridge.com/sunbbs/sunbbs.cgi?mode=form&no=11&page=Lastseasonwhowas[/urloi[/url]
  
   http://web.nanet.cn:8181/2035/news/html/?9431.html




欢迎光临 17TGG服務商 (http://17tgg.com/) Powered by Discuz! X3.1