17TGG服務商

标题: and now can only be transferred to new." [打印本页]

作者: pr6n2mrcnth2    时间: 2015-5-13 23:57
标题: and now can only be transferred to new."
 
Reporters from yantou reservoir management confirmed that the source of drinking water reservoir located in the emerging large dock upstream of the reservoir, but also the county's alternate source of drinking water.
Ecological forest western mountains is a natural ecological barrier in Guangzhou and the Pearl River Delta region,christian louboutin homme, but the electronic waste incineration plant on Language surrounded by a vast forest ecology.
3 sets of smelting furnace stands in the low-lying, billowing smoke enveloped the entire sheet col
Unannounced visits,louboutin homme pas cher, a director surnamed Chen, said sources,nike tn pas cher, mainly from Dali, in part from the Qingyuan and Henan. Eighty-seven per day to burn tons of electronic waste, charge customers 880 yuan per ton.
Last June, the newspaper exposed a hole in the town's new electronic waste incineration plant, the plant has also been destroyed house, in front of the newspaper exposure resurgence.
"So our furnace is widely distributed, spring bay 4, Boluo 3, Guangxi 2, Jiangxi two. But a few years have checked,http://www.ibizstore.com/item/create_form/1, and now can only be transferred to new."
"Never out of stock, the current backlog of goods have burned more than 1000 tons, you have to line up at least a month." He said the person in charge of the plant is idle surnamed boss,http://bbs.mfwlyx.com/home.php?mod=space&uid=4636549, spring spring bay, engaged in e-waste incineration exceeded 8 years.
Reporters saw three smelting furnace stands in the low-lying,nike tn pas cher, billowing smoke enveloped the entire sheet col,http://zazna.com/selection/index.php?item/create_form/1, a dozen workers were burning piles of e-waste, without any protective measures. Ecological forest side of the mountains built two sheds, three or four children were playing.
&#160,http://www.88822.com/#87788/read.php?tid=980;
Once the e-waste incinerator will emit harmful dioxins, polycyclic aromatic hydrocarbons and other substances, lead, mercury, cadmium and chromium and other heavy metals and organic compounds serious pollution of the environment, but also endanger human health. Reporters standing only 10 minutes to feel sick endless. According to statistics, an old cell phone batteries in cadmium can contaminate 60,000 liters of water, the water can be filled with three standard swimming pool.
 
 
 
 
 
 
Welcome to comment I want to comment
This place is located in the emerging electronic waste incinerators runoff Yantou Ridge Mountains,escarpin louboutin pas cher, about 20 km from the east into the town. From yantou Woodland mountain, drove more than 10 kilometers after the yantou reservoir, but closed the door at the entrance that read "No Admittance farming area, and offenders all at your peril." The plant would hide away from the door in the mountains 1.5 kilometers.
 
Nanfang Daily (Reporter / Zhao Hongjie) extraction of metals by burning circuit boards and other electronic waste has been prohibited by the state act. January 1 this year, the official implementation of "waste electrical and electronic product recycling regulations", but also further improve the treatment of waste electrical and electronic centralized licensing and qualification system. However, under high pressure environmental policy,http://www.88822.com/#03666/read.php?tid=980, Yunfu Xinxing yantou floor there is a forest with three large furnaces burning electronic waste incineration plants 24 hours.
&#160,http://bbs.inwemedia.com/forum.php?mod=viewthread&tid=189007;Microblogging Recommended | today's hot microblogging (edit: SN026)
An informed source revealed, much earlier, a local boss contracted a few pieces of fish ponds here, the United boss when another local ponds built in 2008 in the vicinity of this waste incineration plant. "Last August, toxic smoke poisoned 400 acres of ecological forest,http://3cxg.com/home.php?mod=space&uid=10635, once stoppage after being reported." In March,http://ynletv.net/forum.php?mod=viewthread&tid=333, leisure surname boss took over this plant, the three furnaces fully recovered. Chen director also revealed that after the Mid-Autumn Festival in the spring of two idle smelting furnace will be re-enabled at the site.
 
 




欢迎光临 17TGG服務商 (http://17tgg.com/) Powered by Discuz! X3.1