找回密码
 立即注册
查看: 83|回复: 0
打印 上一主题 下一主题

peuterey TJe6NUTEHu8vEoGNa1

[复制链接]

11

主题

11

帖子

55

积分

注册会员

Rank: 2

积分
55
跳转到指定楼层
楼主
发表于 2014-12-6 17:16:29 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
conditions are not ripe."Focus is on environmental issuesIn both "guidance", "moderate development" coal oil and coal gas are of strategic importance given the need to "focus on building" demonstration bases are concentrated in Shaanxi, Inner Mongolia, Ningxia,peuterey, Yellow River Basin . However, these are precisely the areas of limited water resources, ecosystems more vulnerable. Therefore, "the amount of water line" and "implement the most stringent environmental requirements," has become a basic guiding principles. New projects are asked to implement environmental capacity and sewage whereabouts,moncler outlet, effluents are demanding the implementation of the relevant emission standards.If you planned to promote the industrialization of the demonstration, this requirement can be satisfied? Especially those planning in arid regions,Giuseppe Zanotti Pas Cher, there is no sewage discharge conditions of large projects, if necessary to promote,http://www.dab.hi-ho.ne.jp/cgi-bin/user/tamanegi/apeboard.cgi/"/,abercrombie pas cher, but also comply with environmental requirements,http://www.sgjy169.com/home.php?mod=spacecp&ac=blog&blogid=, you can follow the "zero discharge" standard to design and implementation. Has been put into operation in early demonstration projects in these areas is obtained in this way. "Flagging."Just two "guidance" began to develop long ago, a seminar at the Department of Environmental Engineering Assessment Center Environmental Organization, the country has experienced all kinds of existing coal chemical industry,abercrombie milano, have been on the table to discuss what --- Is there a business truly wastewater called "zero emissions"? Existing production process, wastewater treatment technologies and management practices, can not truly clean pollution?Some companies, investment has been modified several times more than originally planned investments doubled,http://web2038.webmall.hostdns.cc/news/html/?2608.html, but still as "inevitable" pollution have been fined; some companies spend millions to do research,abercrombie pas cher france, they found that "it is difficult to convince themselves their own "So local governments have repeatedly urged against the pressure of suspended investment plans.Zhou Shuangbi Environmental Engineering Assessment Center petrochemical textile assessment director told reporters the South: "If the 'zero emissions' just to break through the constraints on the project and made out of a myth.
the project start date has not yet running at full capacity, but it has frequent pollution incidents.Early in 2013,hogan uomo, because the sewage Lo River, local media exposure has been performed. According to the official explanation at the time, this is because the construction phase of the sewage treatment facilities have not been built due. November 2014,http://www.swddgj.com/news/html/?16589.html,nike store, the Southern reporter at the scene saw the Lo River wetlands,moncler, Flanagan chemical plant outfall connection still plugged in Lo River wetlands,http://www.98wan.com/bbs/forum.php?mod=viewthread&tid=244085, water bodies around the still muddy dirty, reeking odor.A side project manager responsible for sewage treatment, told reporters the South, and now the sewage treatment facilities have been completed,air jordan femme, according to the EIA requirements of all wastewater into the sewage treatment plant,parka woolrich, a water reuse. "That must have been blocked sewage pipes, no efflux." He said.Sewage "Scratch" PoolExtend Yulin Coal Energy Company designed "zero emissions" facility,hollister abercrombie, includes a "desert wetland ecological park" project. According to the EIA report,jordan pas cher, this piece of wetland, "the park will solve the remaining water in the water treatment station, high salt,hollister milano, treatment and disposal of sewage treatment plant and drainage problems and spent caustic."November 2014,tn nike pas cher, the Southern reporter found this piece occupies 168 acres of "wetlands" in a desert outside the factory. The project "zero emissions" responsible engineering, Shaanxi Province,air jordan 4, vice president of research design petrochemical Qi Yonghong told reporters the South, which is actually a pool, under normal circumstances should be empty, because the current front-end operation of the facility is not stable fluctuations in some indicators of sewage large.
the existing technology simply can not do it, then it will inevitably mean with either the transfer of pollution, waste-water treatment snuck either. Conclusions can be to verify the facts. ""Unplanned" pollutionJingbian County in Yulin City, Shaanxi Province,tn air max 2014 pas cher,http://sibsolidarnost.ru/index.php?option=com_xijc&view=captcha, there is a river called closed reed wetlands,http://www.liudehua.com/forum.php?mod=viewthread&tid=598417,abercrombie pas cher, local farmers who are drinking and irrigation water. Around 2012, Lo river water began to be covered with large black and white foam sewage, local residents told reporters the South, this is caused by a sewage pipes, sewage pipes under construction in connection with the extension of the coal large chemical Yulin Energy and Chemical Limited.The chemical, known as "the world's first coal, oil, gas utilization project", with a total investment of 28.5 billion yuan, mainly from the 1.8 million tons of coal and 1.5 million tons of methanol residue pyrolysis products and downstream components.According to the Environmental Protection Agency and former MEP now always rings score level approval requirements, such projects should be approval by the Ministry of Environmental Protection. However, the Southern Reporter verified,http://www.maopaobbs.com/home.php?mod=space&uid=36909, Shaanxi Province, the focus of this project in 2008, when a direct grant from the Shaanxi Provincial Environmental Protection Bureau. Because the project site has no body of water pollutant, so Shaanxi Provincial Environmental Protection Bureau on the "zero emissions" as the target implementation conditions and water pollution control projects. Subsequently.
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

j關於我們
尚未設置

Archiver|手机版|小黑屋|一起主機網  

Copyright 2013 最新最精彩-社区论坛 版权所有 All Rights Reserved.

Powered by Discuz! X3.1

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表