找回密码
 立即注册
查看: 78|回复: 0
打印 上一主题 下一主题

Unfinished villa can actually do a real estate license

[复制链接]

5

主题

5

帖子

61

积分

注册会员

Rank: 2

积分
61
跳转到指定楼层
楼主
发表于 2015-2-13 14:25:57 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
Yangcheng Evening News reporter Jiang Bin, Zhao Zhong Wei reports: unfinished villa can actually do a real estate license, and the construction of residential flats owners to follow suit, he was characterized as illegal construction.
Upon receipt of Shiling town squadron demolitions notice again, Mr. Ma on the 24th party to the Yangcheng Evening rebellion complain: We bought unfinished villa when you can live in a house?
Unfinished villa can actually do a real estate license
According to reports, early in October 2009, Mr. Ma was introduced to the owners bought the Huadu District lakeside villas overflow surplus (ie the original Monte Carlo Villa) Building 7 Melody Trail. "At the time there is only one main frame, is unfinished villa floor,http://www.kqczj.com/forum.php?mod=viewthread&tid=568491,christian louboutin homme, if you do not continue to build simply can not live in." Mr. Ma provided to reporters when he bought the unfinished villa floor photographs taken. However, the developers promise Mr. Xiang Ma, "This villa although only a main frame, but as long as you buy, we can help you run a real estate license, and as long as you do not interfere with other people and not to resell, they can tear down the reconstruction."
Mr. Ma carefully understand the villa area,http://onigdesign.com/error.html, found itself in the sixties and seventies was Villa Building renovation or reconstruction of the villa building that developers are not empty promises. So the two sides of 160 million price. June 2010 the developers really put a real estate license to run over to the owners,nike tn pas cher, Mr. Ma,http://www.jjz001.com/home.php?mod=space&uid=20413, in this case, Mr. Ma also began his villa construction project. However, I did not expect last July, Mr. Ma actually received the notice of Huadu District urban management department ordered stoppage. Mr. Ma immediately stop construction, and through formal channels to the Huadu District planning department to apply for construction permits, and the planning department has formally accepted the owners of Mr. Ma's request. In April this year,http://yuzukko.room.ne.jp/~yuzuou/shihatu/yybbs.cgi,louboutin homme pas cher, Huadu District planning department issued a notice to the owner, Mr. Ma,mulberry outlet, said the planning department is studying his application, and hope he can provide further material.
However, the strange thing is, here planning departments should continue to provide owners of materials research, while the other side Shiling urban management department also issued a notice in April this year turned out to be forcibly removed to him again. Mr. Ma was very confused, "those of us who bought a small property owners on schedule exactly how to do?"
Why only two demolitions?
It is understood that, in July last year, within the villa Villa has 43 villas has been characterized as illegal construction-related sectors. Meanwhile,http://xzqbmw.com/home.php?mod=space&uid=158976, the Guangzhou City Management Comprehensive Enforcement Branch Huadu Shiling squadron to which the owners issued 10 notices forcibly removed, and pledged to be opened on July 11 last year. Strange thing, demolitions are not scheduled. Until before the Spring Festival this year, it will be one of two urban management department villa demolitions. And in April this year again received notice of the demolitions, only Mr. Ma and other villas located in the Hills House Mabel diameter.
Yesterday morning,http://bbs.tzinfo.net/home.php?mod=space&uid=997740, the reporter went to the overflow surplus lakeside villa Villa, find more villas are wrapped construction scaffolding inside Villa, next to the reactor with gravel and other building materials. More than 30 houses have been built almost completed villa grab floor, obviously with the surrounding structure villa, different styles. "Those are not the same as illegal construction." Mr. Ma briefed reporters.
Mr. Ma is most puzzling is that the "last July qualitative and issued more than 40 buildings illegally built villa building notice,woolrich outlet, why the only two to be demolished?"
Mr. Ma introduced in April 2 this year, he submitted to the local planning department of the "Report on the application of illegal construction process," ongoing review process; demolitions notice dateline urban management department at the same day. "But we are April 22 demolitions only see this notice." Mr. Ma stressed to reporters.
Huadu District Planning Branch Mr. Ma's reply to the owners said,http://www.jpstep.com/home.php?mod=spacecp&ac=blog&blogid=, "to go beyond the original planning permission to build the construction of part of the newspaper,http://www.51yam.com/home.php?mod=spacecp&ac=blog&blogid=, reported that construction of the original principle requires approval requirements recover. For refusing to be built according to the original plan for the restoration of approval, I Branch will be transferred to the urban management department according to the law or to the court to perform "owner Mr. Ma questioned:."? Why is the planning department when my application is being processed, the inspectors coming dismantle it. "
For Shiling Town overflow surplus lakeside villa Villa, 43 illegal buildings villas what should we do? Newspaper will continue to follow-up reports.
[url=http://www.centralcasse.fr/includes/nike-tn-pas-cher/]nike tn pas cher[/url
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

j關於我們
尚未設置

Archiver|手机版|小黑屋|一起主機網  

Copyright 2013 最新最精彩-社区论坛 版权所有 All Rights Reserved.

Powered by Discuz! X3.1

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表