找回密码
 立即注册
查看: 71|回复: 0
打印 上一主题 下一主题

hollister italia and in February 2010 by the construction plan review

[复制链接]

3

主题

3

帖子

27

积分

新手上路

Rank: 1

积分
27
跳转到指定楼层
楼主
发表于 2015-2-26 18:30:39 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
and by the construction and supervision units site examination, after the pile foundation construction is completed, also were tested, the results are in line with Claim. During the construction process,hollister italia, the council also found under the inspection station construction design documents approved by the choice of the old standard piles, the construction unit to contact and inform the design of pile foundation engineering unit for review,nike tn officiel, but the review is to present the views of the design unit of pile foundation carrying capacity can meet the design requirements. January 15, 2011,outlet woolrich italia, building, construction,tn pas chere, supervision,christian louboutin france, design and survey unit sub-division of the pile foundation engineering quality inspection, agreed qualified acceptance,christian louboutin, Ze Park real estate development company on the basis of the consent of the pile acceptance, and stamped confirmation.Building housing the Bureau concluded that the reported water pile building construction program to meet the requirements.Investor: Report non-developers to safety.
term imprisonment,woolrich bologna outlet, life imprisonment or death, fined or confiscation of property.(Original title: about halfway home massagers rapeZhuhai, a developer of public prosecution's own real estate development (water holidays) Use of non-compliance pile, bear responsibility for fear of future problems, requiring demolition and reconstruction, July 26, after the disclosure of the Southern Metropolis Daily caused widespread concern. 27, Zhuhai developers building housing the Bureau a written response to question,woolrich donna, saying that the water tested after pile installation is complete holiday projects are in line with requirements. In this regard, the developer does not accept, worried that problems still have to bear responsibility for him. Provincial Institute of Civil Engineering from Wang.
the two are deceived to the car. And they held "pistol" for the imitation guns.Among them, the suspect Zhang was found guilty of intentional assault, was sentenced in August 2009 to three years imprisonment suspended for four years, once again committing the crime of fashion in the probation period.Currently, Zhang suspicion of robbery and rape, Liu has been arrested for robbery were Changping Procuratorate approved the arrest. ? regulations"Criminal Law" Article 263:Violence, coercion or other means of public or private property robbery, three to ten years imprisonment and fined; repeatedly robbery or robbery huge amount.
is another of the diagramZhu Haihong Ji investors yesterday south are a responsible person, told reporters that the reason why the media Ze Park real estate report, not out of security concerns, but has other intentions. The responsible person,nike tn, mansion built in the water cap, investors have put in more than 40 million, and the project uses only 204 piles, not the developers said only 20 million investment, pile 400, thus building Newer standards reinforced missing only 400 roots. The project began in October 2010 playing piles,barbour paris, piles from the new atlas was promulgated only a month's time, when the market almost can not find piles comply with the new standards, "the old and new standards during the transition period, the Many construction projects use the old standard of piles, but our quality is no problem, the entire project has passed the inspection, are qualified. "Developer: After problems, responsibility or I come backFor Zhuhai building housing the Bureau of recovery and investors to explain, developers do not accept recycled nutrients. "National Earthquake lessons learned,barbour, as early as 2009 on the introduction of a new pile standards to March 2010 was formally implemented, the middle has to leave enough time." Recycled nutrients in question.
investors are abiding by the law enforcement lax, so that national mandatory standards to become a dead letter.Meng Kai said, from the current responses received,louboutin pas cher, including inspection stations and other government authorities are not yet determined whether the housing quality standards, but said "the building,air max bw pas cher, construction, supervision, design and survey unit agreed to qualified acceptance" equal is to allow the construction side to build their own homes to determine eligibility.
vice chairman and secretary general said that after the implementation of new standards,woolrich outlet online, the construction side of the pile is still using the old standard has indeed illegal,barbour france, but that does not mean that old pile of buildings can not be used,nike tn pas cher, the proposed developer to reflect the provincial Housing Department for the panel on the pile and housing security identification.Zhuhai Housing Construction Bureau: building the pile has been reported by the acceptanceJuly 25,air max femme pas cher, Pearl Heise Park real estate developers and recycled nutrients (a pseudonym) to open a number of media reports.
there are quality problems develop its cooperation with the person in the water Zhuhai Holiday Mansion, because investors beads  and construction side in violation of state standards Use a pile of old building did not meet, leading to the presence of the seismic performance of the project a serious security risk, requiring demolition and reconstruction, in order to avoid problems with the project, which should bear legal responsibility in the future.27,nike tn, Zhuhai building housing the Bureau a written response, said the new national standards for pipe piles (GB 13476-2009) in March 2010 to implement, how about the new standard pile standard atlas made formally implemented in September that year. The Holiday Mansion water early in November 2009 has been completed in accordance with the old standard construction design, and in February 2010 by the construction plan review, examination results were satisfactory.Zhuhai building housing the Bureau, Piles Holiday Mansion water used by the construction procurement units, with factory certification.
相关的主题文章:

  
   http://yue.17tgg.com/forum.php?mod=viewthread&tid=103141
  
   http://www.ejia7.com/home.php?mod=space&uid=83503
  
   http://1973523.info/cgi/warp/apeboard_plus.cgi//
  
   http://www.idbren.com/thread-2828665-1-1.html
  
   http://www.ibizstore.com/K/item/create_form/1
  
   http://www.hlwjr.com/forum.php?mod=viewthread&tid=1067997&fromuid=80416
  
   http://059271.com/forum.php?mod=viewthread&tid=385764
  
   http://www.cjrkxw.com/home.php?mod=space&uid=226847
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

j關於我們
尚未設置

Archiver|手机版|小黑屋|一起主機網  

Copyright 2013 最新最精彩-社区论坛 版权所有 All Rights Reserved.

Powered by Discuz! X3.1

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表