找回密码
 立即注册
查看: 208|回复: 0
打印 上一主题 下一主题

Yesterday

[复制链接]

6

主题

6

帖子

52

积分

注册会员

Rank: 2

积分
52
跳转到指定楼层
楼主
发表于 2014-10-10 06:13:40 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
Chutianjinbao News □ Ventura / reporter Lei Weiwei,nike elite si nike femme soldes
Yesterday, more than 20 owners Caidian Xinyang call the newspaper to reflect the Garden District,mulberry bag daria, said: The second phase of the cell that last August 30 submitted, can be up to now the main building is still in a grassland among not only water and electricity pass, even elevators and other basic support none perfect. Owners repeatedly contact the developer Wuhan River City Music Industry Investment Ltd, the responsible person is always Bierbuxian.
Developers delayed submitted disrupted owners stay program. One owner complained to reporters that in 2010 he purchased a set of the second phase of the residential housing, and so on for three years but it is a sieve, and his marriage had to be postponed repeatedly.
Reporters learned that the district two building contractors  Xiang Construction and Installation Engineering Co., Ltd., in early 2012 had been completed in accordance with the contract the main building. But now, two years later, three of the main building is still as ever, without any progress. This anomaly hidden reason behind what? Why developers set more than 20 owners interest expense? Reporters yesterday rushed caidian investigation.
■ visit
3 buildings surrounded by weeds
The main building has been completed in full
Xinyang Caidian District Garden District is located in the village of Caidian Street three official Yuanjiazao Taiwan,nike air max skyline homme air max cuir noir, more remote location. Yesterday morning, the reporter asking the locals all the way to 5,http://www.blackborder.com/cgi-bin/common/index.cgi, only to find a specific orientation.
Local few high-rise buildings, from afar, this district is surrounded by fields drill.
Approached the sales center cell door on the left, it is a sad feeling rundown. Reporters saw,http://ebookspratiques.com/search.cgi, read, "Xinyang Garden Marketing Center" signs almost faded blue white,http://accesio.com/go.cgi, glass doors tied to a chain, a thick layer of ash falling on the doorknob. Through the glass door, the reporter saw the house a mess. "Two houses were seized by the court, not sell!" 78-year-old Xiao mother busy in front of the vegetable plot, she put reporters as people buy a house, take the initiative to playing greeting. Shaw mother stayed in the district in 2010,louboutin noires chaussures femmes louboutin pas cher, when the price of 2,000 yuan a square meter, "the price is right and very quiet." Shaw mother told reporters that the basic issue of the house has been sold, more than 350 suites currently has more than 100 families to stay. Reporters found that the district does not high occupancy rate and less crowded scene.
Walked beside a cell, the second phase of the new building 8,9,11 Sam Tung appeared in front of reporters. Reporters noted that the three buildings of the main building have been completed, the three 11-storey buildings are on the first floor of shops,outlet woolrich italia,http://angel.kissweb.jp/sanctuary/flame/heart/apeboard.cgi?command=read_message&msgnum=30/, the second floor of the house. Tall buildings surrounded by lush half-human weeds. Reporter walked eight in a cell door,cheapest abercrombie and fitch, found by three floor design, both for rough housing, lift wells black one.
■ the reason
Owed tens of millions for projects
Developer "lost contact"
Xinyang Garden District Why become two three buildings on schedule?
Yesterday morning,doudoune moncler marron moncler doudoune site officiel, reporters on the scene, one claiming to be contractors  Cheung Construction Engineering Installation Co. employees man introduced two 8,9,11 Dong has sold 29 units, more than 240 sets of left unsold. Sam Tung buildings from 2011 began construction of the main building already completed in early 2012. At a time when developers have been unable to pay for projects, supporting projects follow-up is non-existent.
The man also told reporters that the three buildings next to, has plans for two buildings,http://www.goti-death.com/ayane/BBS/apeboard_plus.cgi/</, because the developer funds were not in place, the two buildings has been delayed not started.
Xiang Construction Engineering Installation Co., responsible person also introduced, when signing the contract, the company's first to developers to lend 600 million in cash, and paid 3 million yuan deposit, advance with the construction schedule, the contractor cumulative advance the tens of millions. This person is responsible for numerous experiences of finding the name of the developer, want them to pay the construction cost, the other for various reasons always quibble.
During the interview, an insider told reporters, after the developer charged Xinyang Garden District Phase I and Phase II Yichang fought back the principal investment, but ended in failure.
Reporter inquiry found that River City Wuhan Leye Investment Co. in 2006 registered in caidian registered capital of 20 million yuan,moncler daunenmantel, the legal representative of Hwang is from Zhejiang. Yesterday afternoon, the reporter according to insiders tried to contact the phone number provided by Hwang verify this, Hwang phone is a normal response to the state,acheter basket nike air max one noir et grise, but has not been answered.
■ Disposal
Housing authorities actively intervene
Hope to achieve the transfer of assets
Yesterday afternoon, the reporter went to the Caidian District Housing Authority to understand the situation, the council Development Office official says already know this.
This is the name of the person in charge told reporters that the district a variety of Phase I and Phase II preliminary formalities are complete, and has made a pre-sale permit, but funding problems occur in the late unable to pay contractors for projects. In addition, the residential portion of the tax money the developers have not yet paid in full. Affected by Phase I and Phase II owners can not get the purchase invoice,hollister shirt, some owners are in the process two cards also encountered difficulties.
Caidian District Housing Authority Development Office official said, since last year,http://www.tiaramiyako.com/bbs/bbs.cgi, Caidian relevant departments have begun to deal with the matter, but related work to promote greater difficulty. The person in charge told reporters some frustration that they had repeatedly linked the legal representative of the developer Hwang, Hwang either do not answer the phone or answer the phone said he is not in Wuhan, always deliberately avoided the housing authority. "We sympathize with the owners, and we hope that other departments jointly promote the settlement of the matter." This is the name of the person in charge said, from the current master of the situation,hollister clothes cheap uk hollister sale clearance uk, so that developers continue to complete the construction of the building is unlikely that only through asset The way to make the transfer of the successful completion of the second phase of construction, to ensure maximum benefit of the owners. He said that if this pathway can be achieved, the district will actively cooperate with the Housing Authority in terms of data changes and other procedures, accelerate progress.
■ Progress
Construction side has filed a lawsuit
Or will take over the post supporting
Yesterday, the construction side  Xiang Construction Engineering Installation Co. officials told reporters that they have developers Leye River City Investment Co., Ltd., Wuhan court. After the final assessment Wuhan Arbitration Commission finds that the developer should pay for the construction funds totaling over 6100 square million, has now entered the court for enforcement phase, may enter the auction process. Although the matter has made great progress,http://www.tukipie.net/comono/index.cgi, this person is responsible or not happy. "If the auction unsold,http://www.szskd.net/bbs/forum.php?mod=viewthread&tid=17236&fromuid=6774, this hot potato may have by themselves then." He said with some frustration, post-supporting construction investment will remain is not a small investment.
29 owners how rights? Today Hubei Zhang Fu Jian Law Firm lawyers believe that 29 property owners can apply to the court to lift real estate sales contracts,giubbino peuterey donna, and requires the purchase money be returned in full. After termination of the contract, the owner may also claim compensation from developers. If the developer does not repay due to funding strand breaks cause, the owner can apply investigate whether the other property developers, and then apply to the court for property preservation.
(Original title: developers owed tens of millions of Wuhan foot building into a residential three unfinished)
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

j關於我們
尚未設置

Archiver|手机版|小黑屋|一起主機網  

Copyright 2013 最新最精彩-社区论坛 版权所有 All Rights Reserved.

Powered by Discuz! X3.1

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表