New building just feet from the ground floor delivery found 20 centimeters,http://kuze.tsukaeru.jp.
Who lives in Nanjing Jiangning Golden Palace cell 35 residential building owners recently to the newspaper: our building just delivered soon, buildings and ground to convergence at serious fault,escarpin louboutin pas cher, you can simply use "terrorist" to describe. Reporter survey found that "heel" part of the buildings and residential buildings are indeed serious ground out, many parts of about 20 cm gap. However, after the detection of Jiangning District Construction Bureau, said the cracks are not house the main structure,nike tn pas cher, does not affect the safety of the main structure of the house, it has ordered the developer to repair construction.
?
The reporter Jiao Zhe photo coverage
?
On site
?
House feet off the ground has been 20 cm
?
"Holes" can be seen at the underground pipeline
?
August 4 at noon, the reporter arrived at the Jiangning River Bridge Underground station on the eastern side of the given gold palace district. 35 residential buildings in the area downstairs,louboutin homme pas cher, reporters did find fault there is a large area of residential buildings and the buildings of convergence at the ground. It has been observed that these fault zones are mainly concentrated in the back of the building residents, that is one side of the terrace is located. Most of the residential buildings and the air gap between the floor are more than 20 cm.
?
Reporters leaned over and looked through the crack inward, find residential building "at the foot" large part of it is a "hole", some pipes laid underground looming, in addition to some garbage. From this perspective, it seems,http://cxxy.8oo.net/forum.php?mod=viewthread&tid=328507, the entire 35 residential buildings, such as a floating "castle in the air." However, dozens of other buildings and residential buildings, a similar situation does not arise. And coincidentally, this building residential buildings in the district most edge,http://www.vegeta.jp/cgi-bin/recipe/noahbbs.cgi, next to a few hundred meters from the site of another under construction, I do not know this,http://www.23bc.cn/home.php?mod=space&uid=33907, and the question whether there are 35 building association.
?
Developers
?
No foundation settlement
?
Rain led to backfill soil subsidence
?
Owners told reporters that 35 residential buildings is just delivered a couple of months ago, there are some owners to stay, most people still decorated. "Just bought a house not live underground to crack, and you say that we can rest assured that it?" The owners said they afterwards find developers,http://www.suzuya-r.jp, the other said the house is no problem, and now they have this complaint to build Jiangning District Industry Bureau.
?
Reporter then went to the cell door gold palace sales offices, it is understood, is the developer of the estate Jiangning gold group. For 35 residential buildings of the problem,http://bbs.laofoye.cn/forum.php?mod=viewthread&tid=6379, a sales office staff office, said the building's foundation is not sinking, but due heavy rains, the building at the foot of the backfill soil subsidence, and that has caused this situation. Aspects of the current developers are waiting for test results Construction Authority and treated in accordance with the views of each other's work. "The house is not a problem."
?
Construction Bureau
?
"Fracture" without prejudice
?
Housing main structural safety
?
Yesterday, reporters learned from the Construction Bureau of Jiangning District, the quality supervision department of the site for the council. Owners reflect, "serious fault" part of the main structure of the appearance of non-gold palace houses 35 house foundations and the ground surface, but attached to the main house dado outdoor concrete "in bulk." This issue does not affect the structural safety of the main house.
?
It is understood that the so-called "bulk water" is the base of the wall in order to protect against water erosion, the external walls of four weeks in the ground to make outwardly inclined slope, so the rainwater into the distance. This is a common basis of measures to protect the house.
?
Jiangning District Construction Bureau,http://www.huatai123.cn/home.php?mod=spacecp&ac=blog&blogid=, said the reason for 35 residential buildings in "bulk water" sink is below backfill caused by subsidence. After investigation,boutique louboutin paris, 35 storeys outdoor backfilling depth of about five meters, as developers build a house in less than earthworks compaction, coupled with the recent precipitation is more to speed up the post-consolidation settlement of soil, resulting in "bulk water" with the soil underneath differential settlement between the main structure, resulting in concrete cracking and breaking bulk water. Construction has ordered the developers currently organizing the implementation of compacted backfill earth as soon as possible and restore corrupted "bulk water."
?
Owner
?
The filled out
?
Will it float again in the future?
?
Yesterday afternoon,http://hiout.cn/home.php?mod=space&uid=985, a reporter Valley director and developers responsible for this contact. She said the current backfill work has been basically completed. "Voids" and cracks has been basically non-existent under 35 buildings, then after the end of the rainy season, will be "bulk water" repair and construction.
?
For this result, some residential property owners expressed frustration temporarily acceptable, but they more doubts. "You say this newly built house will rework this even repaired,air max outlet italia, then it will not be suspended again?"
?
Welcome to comment I want to comment
?Microblogging Recommended | today's hot microblogging (edit: SN047)
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

j關於我們
尚未設置

Archiver|手机版|小黑屋|一起主機網  

Copyright 2013 最新最精彩-社区论坛 版权所有 All Rights Reserved.

Powered by Discuz! X3.1

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表