|
and strive to put into use before the opening of Universal Studios, and Universal Studios in 2019 for business.East Extension project to start this yearIt is understood that the 7th line following the line 1, line 6 and later an east-west backbone line. Currently pass from Beijing West Railway Station to the East Fifth Ring coking plant station nearby. This year, the 7th East Extension project started.Recently, the Beijing Central ASTRI released the road for the first time in the EIA publicity. Announcements, Beijing Metro Line 7 East Extension project is already open to traffic operations on the 7th line extending east line, west of the 7th line both coking plant stand, set up the terminal at Universal Studios,peuterey spaccio, across the board a total of seven stations. Primarily through Chaoyang,louboutin paris, Tongzhou District,abercrombie et fitch, two areas, line the whole length 17.0km,peuterey outlet, of which 2.3km elevated line in the east parking lot a six-ring set.Reporters from the initial planning diagram on the 7th Line East Extension project to see, within the East Extension station by the East Fifth Ring coking plant to the southeast through the Fifth Ring Road.
after Douge region,abercrombie milano, along square paths, laying Wansheng Street . Map shows the location of the easternmost extension of the East line, has been approaching the southeastern six rings. It is understood that initially identified seven main distribution station in the village of Huang Long,chaussure zanotti, Douge, Wansheng Street, Cloud View Road,hogan outlet scarpe, small mazhuang, tall gold and Universal Studios area.Or transfer in Tongzhou two linesIt is reported that the 7th East Extension program started this year, and strive to put into use before the opening of Universal Studios, and Universal Studios, is expected to open by the end of 2019. Meanwhile, Batong also will extend a station to Universal Studios, and the 7th line "handshake", the opening time are also expected in 2019.In addition to Universal Studios station, line 7 East Extension also has a transfer station in Tongzhou. Responsible person, Wansheng Street Nishiguchi Station is expected to transfer planning S6 line connecting the old and new two airports. ? demolition progressYile Road demolition rings to less than halfCurrently,nike sneakers, some rings to Yile Road sections have been admission, but there are still sections of the demolition progress has been slow, involving the demolition of part of the line, 40% of the trees, 60 percent of houses. To be demolished house in half for enterprises, half of the houses.It is understood, has completed half of the trees removed, the demolition of houses also completed about half of the business part of the capital not yet be opened. In accordance with the requirements of the relevant departments, will be completed in mid-September or demolition work.Jinghua Times reporter Huang Hailei EdMay 28, Hebei Cangzhou 104 national highway,scarpe hogan outlet, a van transformed into fuel trucks, big trucks to refuel. Beijing News reporter Houshao Qing photo ? Cangzhou State Road 104 gas stations across the black track The Beijing News (Reporter Wuzhen Peng) August 3, the Beijing News published survey report "Cangzhou black gas station across State Road 104.
" unannounced visits to expose the 104 National Road, Hebei Cangzhou clouds along the black gas station at least 10 points.
Tsuyama line left line reconstruction and other projects.Secondary EIA publicity a full range of seven stations, before the news that the site will be located in Tongzhou,giuseppe zanotti homme, Beijing, the publicity made real the news. The first public display of the new station is located in Tongzhou Beijing East Railway Station. The other six stations are: Yanjiao station, Tangshan station,magasin nike, Dachang station,abercrombie milano, Xianghe station, Baodi south, crow hung bridge. Wherein, after four stations for the new station. In addition to seven stations,abercrombie pas cher, the Beijing Chinatown occasion also set aside an Airport South Station.According to the plan,doudoune pjs, the line is expected to start during the year 2015, long duration 3.5 years, that is to say,abercrombie e fitch, Beijing Chinatown fastest international traffic by the end of 2018. Upon completion,hogan outlet scarpe, the Beijing to Tangshan running time will be shortened to 30 minutes, Tangshan will really join the capital and a half-hour economic circle.In addition, the Beijing Times reporter learned that, Tongzhou Yanjiao will build a variety of formats and rail transportation, in addition to the Beijing railway Chinatown, planning Pinggu line will also be connected with the Yanjiao Tongzhou, however,barbour france, the line speed of 160 km belonging to the Regional Express Line.In addition, Metro Line 6 Terminal Lucheng Station also set aside the conditions for the extension of the East Yanjiao.Line 7East Extension 7 stop direct Universal StudiosRecently,2014 Scarpe Hogan, the Beijing Central ASTRI released on the 7th Line East Extension project in the first round of the EIA announcement. Announcements, according to the preliminary plan, the 7th line east of the easternmost extension of the project by the end of the current coking plant station continues eastward 7 station. It is reported that the 7th East Extension program started this year.
相关的主题文章:
http://www.frenzee.org/viewtopic.php?pid=30452#p30452
http://shineryc.com/bbs/forum.php?mod=viewthread&tid=102725&fromuid=11994
http://single-parent-family.com/home.php?mod=space&uid=28771&do=blog&quickforward=1&id=7956
http://syxxz.com/home.php?mod=space&uid=128333
http://bbs.xuanfang.org/home.php?mod=space&uid=35749
http://zazna.com/selection/index.php?item/create_form/1
http://zu110.com/home.php?mod=space&uid=18406
http://66q1.cn/news/html/?29634.html |
|