|
Successful road not opened BRT! Two days ago, Vice Mayor Pan Shijian revealed when you answer the mayor line. This decision of government,air max pas cher femme, won the support of many people, but it has spent tens of millions of BRT construction site, now dusty, broken, broken,http://www.4899.cc/forum.php?mod=viewthread&tid=545524&fromuid=9971, rusty rusty, and some even become homeless family, causing serious waste of resources.
BRT still have not happened
BRT success Xiamen Bridge Avenue Line recently walked out of the island, by Park Bo Yuan, forward from Kyorin bridge from the island. This is the last year of the plan.
It is understood, BRT success Avenue Line plans to set up 19 sites: Xiamen Port Junction, text was Road Station, Yi Ai Road Station, Lu Ling Road Station,http://www.tkylcac.com/forum.php?mod=viewthread&tid=79411&fromuid=36144, Xianyue Road Station, Jinhu stations, security pocket stations, airports Avenue Station ,piumino moncler outlet, Joint Inspection Station,http://stly.hekee.net/forum.php?mod=viewthread&tid=35925, College Station sailing,http://182.92.156.98/upload1/forum.php?mod=viewthread&tid=301704, Park Bo Yuan station,http://www.daguanxian.com/forum.php?mod=viewthread&tid=103359, Kyorin Village Station, Xiamen in ten points, within Mau interchange stations, apricot North Metro Station, Central City Station, Xiamen Engineering Machinery station, irrigation Town government station, filling the mouth hub.
By the end of 2009, the island has had success Avenue Line traffic conditions, it seems to open soon. However, to date the past year, BRT yet to see movement.
Located on the island successfully Avenue 7 BRT sites have been built, two-way total of 14. According to informed sources,moncler bambino outlet, the cost of 14 sites to be tens of millions.
BRT opened big risks
Why not opened successfully Boulevard BRT? This year in September, the city Transportation Commission Director Lin Jinping pointed out in answer Mayor lanes, according to research, the majority of successful road along with bridge and tunnel, traffic is not enough, if you want to open BRT, must be closed as a two-lane BRT lanes,nike tn pas cher, so do "worthwhile."
Many people hold the same idea that there are three successful road opened BRT drawbacks: Success Avenue is a fast road, traffic quickly, opened BRT will interfere with other vehicles, unsafe; successful road tunnel is relatively long and is not suitable for bus pass car; BRT sites far away from residential areas, the upper and lower passenger inconvenience.
Xiamen City is promoting rail transit plan in place BRT. Vice Mayor Pan Shijian on Saturday when answering, said Mayor lanes and rail transport compared, BRT many deficiencies,spaccio peuterey, Xiamen is in full swing rail-front planning and design work.
Site into a tramp home
Idle site how to do? Herald reporter yesterday afternoon along the way to view these BRT sites have been covered with dust, utterly useless, no one to clean up the garbage everywhere, facilities rust.
In the station, on the second floor of the site text was the road to success Boulevard aisle, arrayed brooms, baskets and other cleaning tools, a pair of men's shoes lying on the ground, the walls hung with a black backpack ladies, there are kettle, bread and headphones belts seems to have become "Clean House."
Lake Success Avenue intersection points, it becomes Rangers home. Aisle site, laying a piece of linen, lying above the individual, covered with blankets,chaussures jordan pas cher, fast asleep. Lu Ling junction station, a worn blanket hanging on the wall, apparently also been occupied by the homeless.
According to the BRT station company, property Avenue BRT sites have not successfully transferred to the company, at present only by escrow, sent to clean, inspect, as to how to use the future,interactive hogan, they do not know.
Proposal
BRT site into a police office
Municipal CPPCC Standing Committee, vice chairman of the NLD Xiamen Municipal Award Zhu Huai believes that the success of the two parts of the plane and space Avenue BRT site,http://onigdesign.com/error.html, can be fully utilized.
He suggested that the part of the space station compartment BRT out, used as a police office. In addition to the security police office, you can also change the duty point road,http://bbs.e-xintai.com/forum.php?mod=viewthread&tid=290631, traffic police and other departments.
In the text was Road Station, Herald reporter found that the site has become cleaner in the lounge. Zhu Huai Prize think a little space can also be used as a channel separated classrooms, so that road maintenance, road cleaning workers have a rest, drink plenty of water where they are too hard.
As for the wall BRT site, Zhu Huai award proposal, brought to a suitable wall for advertising light boxes, one can beautify the environment, and secondly, you can do some business and public service advertising. "Perhaps years later,moncler sito ufficiale, advertising revenue has been flat construction costs against the site." He said.
Success Avenue bus can open major stations
Traffic expert Lin Earth pointed out that although successful road barrier BRT, but the bus can pass major stations, using the existing bus stops, but not necessarily all use ordinary bus is 300-500 meters a station, a distance of major stations can be more bus stops farther.
He envisaged that the major stations Bus departure from White City, after successful road after walking several directions: Take the Bridge of Xiamen Island, or to Gaoqi Airport. "Success Avenue,tn pas cher, no traffic jams, the opening of the major stations of the bus after the rush of time people are willing to take, after more and more people." He said.
Yee See
Tens of millions to buy a lesson
Original construction was in full swing nonstop, built after the sideline as decoration,tiffany outlet, success Avenue BRT is like a joke.
Zhu Huai believes Award, BRT site is in accordance with the design of the site to build,nike tn requin,http://cakaraoke.com/comments/693507.html, regardless of use and transform the waste of resources has become an indisputable fact, according to several million dollars to build a site to calculate the 14 sites is necessary to tens of millions The money has been wasted.
Success Avenue BRT's biggest joke is that the completion date of the site is its date of death, it had not enabled the possibility in the future to enable almost zero. It died in the cradle.
BRT is the right decision not to take the government sector,basket nike tn, but also spent tens of millions to buy after the lesson, in the future, feasibility studies of major projects, be sure to draw a lesson.
Herald reporter Lv Hanwei / text witch aromatic / Chart |
|