找回密码
 立即注册
查看: 130|回复: 0
打印 上一主题 下一主题

scarpe nike air max to handle all the sewage is expected to take 2-3 months tim

[复制链接]

7

主题

7

帖子

47

积分

新手上路

Rank: 1

积分
47
跳转到指定楼层
楼主
发表于 2015-10-5 17:41:51 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
,air max italia
to prevent leakage.According to estimates,nike air max italia, the current paragraph 3 line is sealed, the cyanide is about 10,000 cubic meters of wastewater, environmental protection departments will be a fragmentation process according to different situations. According to experts,air jordan donna, a relatively high concentration of cyanide-containing wastewater is available special vehicles pulled hazardous waste treatment plant for processing,nike air max, lower concentrations of cyanide can be in place by breaking apparatus for processing.More than 140 professionals handling cyanideThe site is about 700 tons of sodium cyanide has been the focus of public attention. 17 has identified three kinds of treatment options: been exploded exposed, clean-up appearances, the medium and the use of hydrogen peroxide or other approach to; large area scattered with earth or sand cofferdam construction of one meter tall to be closed of buckets undamaged,nike air jordan, timely removal evacuated to a professional company for disposal. Currently, there are more than 140 staff sodium cyanide production enterprises have arrived at the scene, three classes disposal in accordance with the unified command.It is understood that before about 150 tons of sodium cyanide has been relatively decentralized complete disposal completed and shipped back to the factory in Shijiazhuang, Hebei. Related company officials have come to the scene to participate in more professional disposal. Permission headquarters, they will live in unity cyanide and other chemicals transported from the scene. ? RelatedSatellite comparison chart IPOYesterday.
the core area of the accident in the image comparison chart before and after the first public explosion.Reporters from the Aerospace Science and Technology Group was informed that after the explosion, China Resources Satellite Application Center starting in August 13 an emergency response mechanism, emergency arrangements for multiple satellites high-resolution remote sensing satellites, imaging core area of the accident, to the relevant departments for disaster assessment and rescue command.Yesterday experts show satellite images showed the explosion caused serious damage.Minister of China Resources Application Center run service CASC had Chung introduced explode before the image is very neat and orderly.
the scene has two small explosion occurred, and lit the white smoke. After the explosion stable,chaussures louboutin, chemical and emergency officers and men of the air around the explosion point detection.Currently the accident site clean-up work in progress, which will result in secondary pollution,zanotti femme, Tian Yong said that now there is definitely out of the vehicle pollution. To this end,nike free run 3.0, the National CBRN emergency rescue team and out of the vehicle decontamination,air jordan donna, thus ensuring that the pollution problem will not take out the core area.Large puddle of sewage treatment required 2-3 monthsYesterday morning, environmental emergency work group of experts came to the big puddle formed again explosion sampling. With the previous single point water is different,air max italia, this is the establishment of a sampling point in the big puddles around every 50 meters,chaussures louboutin, in a more comprehensive assessment of a large puddle of water quality.Experts are now different concentrations of different points, the highest concentration of cyanide is exceeded up to 800 times, the lowest concentration of only twice.Panel members Lixing Chun said that after three testing,peuterey donna, has mastered a large puddle of water quality characteristics,nike air max outlet, and develop a treatment plan: First,nike air jordan, lift pump, and second pipeline,air max outlet, three cyanide device is broken, four is sent to the sewage treatment plant deal with. These methods ensure that the cyanide discharge standards.According to reports, now large sewage pit of about 50,veste moncler femme outlet,000 tons. A daily sewage treatment equipment broken cyanide about 5000 tons,soldes louboutin, to handle all the sewage is expected to take 2-3 months time, the device is currently being stepped up laying expected one to two days to open the drain.Anti-sealing three wastewater containing cyanide leaking pipelineIn addition to land clearing,nike france, groundwater safety investigation is intensifying. Environmental protection departments have been at the scene further lock the approximate range of underground pipeline control area of wastewater containing cyanide and concentrationHigh of three pipeline closure.
相关的主题文章:

  
   http://www.infocrystal.com/alink/apeboard_plus.cgi?command=read_message&msgnum=620/
  
   http://www.lqwhg.com/Review.asp?NewsID=33
  
   http://en.newmine.net/forum.php?mod=viewthread&tid=5987639
  
   http://www.huatai123.cn/home.php?mod=spacecp&ac=blog&blogid=
  
   http://www.clarityenglish.com/englishonline/index.php?item/create_form/1
  
   http://www.infocrystal.com/alink/apeboard_plus.cgi?command=read_message&msgnum=970/
  
   http://sjh.bbs.windplay.cn/forum-53-1.html?mod=spacecp&ac=blog&blogid=
  
   https://www.jnjvisioncare.co.uk/index.php?item/create_form/1
[url=http://www.ceder-reprendre-une-entreprise.fr/barbour.html]barbour pas cher[
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

j關於我們
尚未設置

Archiver|手机版|小黑屋|一起主機網  

Copyright 2013 最新最精彩-社区论坛 版权所有 All Rights Reserved.

Powered by Discuz! X3.1

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表