|
|
Newspaper reporter trainee newspaper reporter FENG Yi Chen Yan
Jinhua City Ring Road and Pine Road intersection there is a beach "magic" of water,http://www.jmfcw.com.cn/luntan/forum.php?mod=viewthread&tid=78729, regardless of sunny rain, the water in this beach. Nearby residents said the situation has been three or four years, and has been nobody. Reporters follow-up survey found that this intersection is actually "limbo", no one department is willing to bear responsibility.
From July 21 to start,http://www.appconnect.in/data/qmqieshqtc.html,http://beer.dramamusicschool.com/item/create_form/11, "City of Zhejiang thing" has continuously reported the matter.
Recently,http://longestcockmedia.com/lib/pcbosailvc.html, with the construction of the new Highway Jindong Wucheng headquarters after examination, identified the intersection of basic water causes.
However,http://www.jisc.go.jp, this result somewhat humorous: intersection sewers below, is actually blocked by a brick wall.
Relevant departments explained that doing experiments then closed water pipeline inspection, the wall is used to retaining the. After the experiment, the staff forgot to tear down the wall, creating an "artificial" clogging!
Sewers mouth, actually there are wall
To understand the water pipe network under the road find out what the problem, recently,http://www.h2acomunicacio.com/link/bobnmywvfr.html, Jindong Highway Contact New construction Wucheng headquarters north of the office staff of the two units together under the water wells to see.
Appeared in front of the scene,http://cocoon.pop.tc/prt/ff/p-dayff/apeboard_plus.cgi?command=viewres&target=345767/, so the staff was stunned. Neither is the pipe is collapsed, nor is originally blocked guess is garbage, but the mouth of the pipe puzzle brick wall will block a seamless whole pipeline.
"Even when the acceptance network to do closed water test,http://www.nousoma.co.nz/wp-cache/fpgpxdzevk.html, this wall is to do the test and puzzle, may not be removed after the test done." Jindong Highway segment assistant surnamed Xing Long explained that the so-called "closed water test",http://csillakorom.hu/lib/zrnnxtekxk.html, is to use a brick wall to seal both ends of the pipe are then filled with water to the pipe in order to test whether the pipeline itself leaks and seepage problems.
Then not found because "less water"
Why had not tear down this wall?
North Office Yan,http://www.promenadedental.com/wp-temp/mclitulmda.html, deputy director, said this is the year when the construction of the second ring road is segmented result: "At the time we closed water test of time, Jindong period not completed,http://longestcockmedia.com/lib/kqqsixvmuu.html, probably because of this, so do not knock the brick wall off. "
However,http://columbiact.calypsobluepoolandspa.com/?q=comment/reply/19, when Jindong and Wucheng engaging portion of the pipe network construction finished and turned on,http://popexpress.biz/data/qsgkzjxkut.html, both actually have not found the pipeline is blocked. For this, Yan, deputy director of the explanation is that there is nothing in this business within the city limits near the intersection Wu, production sewage little, so did not discover this problem,http://csillakorom.hu/lib/lricfbysrx.html, "and I was in 2007 before the arrival of the year of acceptance I am not very clear case. "
After the brick wall demolition, pipe network can be unblocked
To confirm the interpretation Jindong,http://z-tech.jp/bbs1/sunbbs.cgi?mode=form&no=9436&page=1, Wucheng given reporters Xiang original Ring Road design units - Jinhua Municipal Design Institute Limited confirmation.
Surnamed Chen told reporters, after the newspaper reported that he checked the drawings, but also to the scene investigation, the problem is definitely out in the Second Ring Road and Pine Road intersection,http://www.h2auniformitat.com/cache/lckrpfjgza.html, "the greatest likelihood is that closed water test After that, it did not get through brick wall, resulting in sewage coming out from the road. "
He said that in the strict sense,http://www.vibrantsantafe.com/cgi-bin/vibrant/search.cgi, the closed water test after confirming that no water seepage, should knock down a brick wall to the delivery and acceptance,http://www.italica1861.com/console/mbpnzprnaf.html, "After the test,http://www.italica1861.com/console/zjskhpjhxu.html,http://www.ahrztj.com/forum.php?mod=viewthread&tid=32737, you should carefully check again about the pipeline, it may be too thick original check."
Is not knock this wall, pipes will flow out?
Chen said that this crossroads thing two sewers can pass to the sewage treatment plant, "as long as these brick walls torn down, where the water had lined up." |
|